ACTION 4.2.1

Enhance existing facilities and build additional athletic fields (indoor and outdoor) and playgrounds.

Planned 2025

Key Performance Indicators

Develop a long range facilities improvement plan for Storrs Hill Ski Area.
In Progress
Description

Develop a long-range facilities improvement plan for Storrs Hill Ski Area.

Current Status
  • Storrs Hill Facilities Planning Advisory Committee has completed data discovery and is producing their final report, February 2025.
Timeline: 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks Lebanon Outing Club
Replace problem fencing at Riverside, Civic, Basin, Eldridge and Colburn.
In Progress
Description

Replace problem fencing at Riverside, Civic, Basin, Eldridge and Colburn.

Current Status
  • Civic and Eldridge fencing repairs completed. (2025)
Timeline: 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Expand Rec Dept equipment fleet to accommodate present and future needs
In Progress
Description

Expand Rec Dept equipment fleet to accommodate present and future needs will result in less reliance on outside contractors. Two new tractor attachments each in 2024 and 2025.

Current Status
  • Offset flail mower obtained Fall 2023.
  • Seeder and fertilizer spreader obtained Winter 2024.
  • Key piece remaining is a deep tine aerator. (2025)
Timeline: 2024, 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Increase shade footprint by at least 200% at the Lebanon Veterans Memorial Pool by 2026.
Planned
Description

Increase shade footprint by at least 200% at the Lebanon Veterans Memorial Pool by 2026.

Current Status
  • Looking at designs for solar roofed pavilions. (2025)
Timeline: N/A
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Create Civic Park Master Plan with athletic field, playground, parking, perimeter trail by end of 2024.
In Progress
Description

Create Civic Park Master Plan with athletic field, playground, parking, perimeter trail by end of 2024.

Current Status


Timeline: 2024
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Replace one pump per year over three years at the Lebanon Veterans Memorial Pool to increase energy efficiency from 2024-2026.
Planned
Description

Replace one pump per year over three years at the Lebanon Veterans Memorial Pool to increase energy efficiency from 2024-2026.

Current Status
  • Lap pool pump and motor replaced in Summer 2024. It is still being evaluated into Summer 2025.
  • Anticipating splash pool pump and motor replacement Fall 2025.
Timeline: 2024, 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Remove invasive knotweed and consolidate storage and location of sheds to Pat Walsh Park.
In Progress
Description

Remove invasive knotweed and consolidate storage and location of sheds to Pat Walsh Park.

Current Status
  • Foamstream Weedtech machine purchased December 2024, providing a non-herbicidal method of killing weeds in parks, sidewalks, and any place weeds grow. (2025)
Timeline: 2024, 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Establish future location of the Lebanon Community Center by 2024.
Planned
Description

Establish future location of the Lebanon Community Center by 2024.

Current Status
  • Potential location with Signal Park is being actively pursued with landowner.
Timeline: 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks
Create playground replacement plan and remove dangerous elements by end of 2024.
Planned
Description

Create playground replacement plan and remove dangerous elements by end of 2024.


Current Status
  • 100% of Civic Plays funding is secure.
  • Installation scheduled for April 2025.
Timeline: 2024, 2025
Due Date: N/A
Responsible: Recreation, Arts, and Parks Friends of Leb Rec
KPI Details
KPI Details
KPI Details
KPI Details
KPI Details
KPI Details
KPI Details
KPI Details
KPI Details